  1. Acceptance Overview
    1. Overview of the Project Owner

Shandong Huafu Chemical Co., Ltd. (hereinafter referred to as Huafu Chemical) Founded in 2006 year 1 Month, its predecessor was originally established in 1914 The former Jinan Chemical Plant of the year , Located in the Diaozhen Chemical Industry Park of Jinan City, with a registered capital of 8000 Ten thousand yuan, employees 322 People, including engineering and technical personnel 65 Person. Company Original A set 4000t/a Tetrafluoroethylene monomer, one set 3600t/a Suspension polytetrafluoroethylene unit, one set 100t/a Perfluoroalkoxy alkene polymerization unit, one set 6000t/a Difluoromethane ( R32 ) Device, a set 1000 t/a Sodium fluoride plant.

Among them A set 4000t/a Tetrafluoroethylene monomer loading Place , a set 3600t/a Suspension polymerization polytetrafluoroethylene unit Normal production; A set 100t/a Perfluoroalkoxy alkane polymerization unit Has already 2017 Production ceased this year; neither raw materials nor finished products are stored. ; A set 6000t/a Difluoromethane ( R32 ) Device Has already 2019 year 1 Production is suspended for the month, and neither raw materials nor finished products are stored. ; A set 1000 t/a Sodium Fluoride Plant ( 2022 year 2 The plant has been shut down for the entire month, with raw and auxiliary materials and finished products stored on-site. ) 。

    1. Overview of the Acceptance Project

2018 year 12 In [month], the company commissioned Shandong Qingke Environmental Technology Co., Ltd. to prepare the “…” Shandong Huafu Chemical Co., Ltd. 30 ton / Annual chromium mist inhibitor ( F53 ) Technological Transformation Project Environmental Impact Report, 2018 year 12 month 29 Day, original Jinan City Environmental protection The Bureau, in the Ji Huan Report… 2018 》 34 Number Text Approve accordingly.

The project was initiated in 2020 year 5 Construction commenced in [month], and by [year]... 2021 year 6 month Completed construction and Begin debugging. The enterprise on… 2021 year 5 In [month], a change was made to the pollutant discharge permit, certificate number: 913701817806256763001P。

The construction scope includes, within the existing plant area and leveraging the ancillary facilities of the original carbonyl fluoride pilot-scale unit, the development of… 30 ton / Annual chromium mist inhibitor ( F53 ) Production facilities and supporting infrastructure. Water supply and drainage, heating, storage, a temporary hazardous waste storage room, an emergency spill containment pond, wastewater treatment, an incinerator, as well as office and residential facilities will all be integrated with the existing plant. Upon completion, the project will have an annual production capacity of chromium mist suppressant. 30 Ton.

In accordance with the “List of Major Changes for Pollution-Related Construction Projects (Trial)” (Huan Ban Huan Ping Han [ 2020 》 688 No.), this project There have been no significant changes to the nature, scale, location, production processes, or environmental protection measures; therefore, the completion‑stage environmental protection acceptance inspection may proceed.

According to the “Decision of the State Council on Amending the Regulations on Environmental Protection Management for Completion of Construction Projects” (State Council Order No. …), 682 number), as well as the Ministry of Environmental Protection’s “Notice on the Issuance of” < Interim Measures for Environmental Protection Acceptance upon Completion of Construction Projects > Announcement (National Environmental Regulation on Environmental Impact Assessment, No. 2017 》 4 number), Shandong Huafu Chemical Co., Ltd. at 2022 year 3 Preparations begin in the month. “ Shandong Huafu Chemical Co., Ltd. A 30 ton / Annual chromium mist inhibitor ( F53 ) Technological Transformation Project ” Completion-stage environmental protection acceptance work, 2022 year 3 In [Month], our company was commissioned to carry out environmental protection acceptance work. Following an on-site investigation and in conjunction with the environmental impact assessment report and its approval, we prepared an acceptance monitoring plan, which was then implemented in [Year]. 2022 year 9 month 13 day ~9 month 15 day Proceed to the site to conduct on-site acceptance testing.

Based on the verification of project construction content, the implementation status of environmental protection facilities, and the analysis of monitoring data, our company has completed the preparation of the “…”. Shandong Huafu Chemical Co., Ltd. A 30 ton / Annual chromium mist inhibitor ( F53 ) Technological Transformation Project Completion Environmental Protection Acceptance Monitoring Report , during the report preparation process, we received Distinguished experts of the expert panel We would like to express our heartfelt gratitude for your enthusiastic guidance and active cooperation.

2022 year 9 month

Project Team

For details of the acceptance report, please refer to the attachment:

Attachment link: https://pan.baidu.com/s/1Avezsndixrc4XyjXjhrHlQ?pwd=j1j4

 

Extraction code: j1j4

 

Contact Us

Submit Message